BERC Regulations 26Chapter 3 · Technology specific parameters for Solar PV, Power Projects
Section 26 · Capacity Utilisation Factor
Text size — level 1 of 4
(1)
The Capacity Utilisation Factor (CUF) for Solar Photovoltaic (PV), Rooftop Solar PV and other Small Solar Power Projects shall be 19 Percent:Provided that the Commission may deviate from above norm in case of project specific tariff determination in pursuance of Regulation 7 and Regulation 8.Your private note on this section
Only you can see this note.

