MPI Act 79Chapter IX · Construction and Maintenance of Private Irrigation Works
Section 79 · Demarcation of land required for grant-in-aid irrigation works and estimate of cost
Text size — level 1 of 4
- If the Collector, after making such inquiry as may be prescribed by rules under this Act, considers that the application should be granted, he shall require the applicant to deposit within such time as the Collector may specify, the estimated cost of the demarcation of the land, which in his opinion it will be necessary to occupy for the construction of the work, and, when such deposit has been made, the Collector shall proceed to demarcate such land and frame a preliminary estimate of the cost of acquiring it under this Act.
(2)
If such deposit is not made within the specified time the Collector may dismiss the application.Your private note on this section