RERC Regulations 71अध्याय VI · Tariff for Hydro Power Generating Stations
धारा 71 · Recovery of capacity charges
अक्षर आकार — स्तर 1, कुल 4 में से
(1)
Full capacity charges shall be recoverable at normative capacity index specified in Regulation 64 above. Recovery of capacity (fixed) charges below the level of target availability shall be on pro rata basis. At zero availability, no capacity charges shall be payable.(2)
The payment of capacity charges shall be on monthly basis in proportion to the allocated/ contracted capacity.इस धारा पर आपका निजी नोट
यह नोट सिर्फ़ आप देख सकते हैं।

