EPCM Rules 3
धारा 3 · Process of manure conservation
अक्षर आकार — स्तर 1, कुल 4 में से
(a)
The pit shall be filled up from shallower end (where the depth is less) and daily collections shall be evenly deposited over a small length of 2 to 3 feet till the level of manure reaches a height of 1 feet above the ground level. The manure shall then be covered with a 1 to 2 inch layer of dry earth. This process shall be continued till the entire pit is filled up from one end to the other.(b)
The manure shall not be used earlier than 2 months from the date when the pit was completely filled, except with the permission of the Manure Conservation Committee.इस धारा पर आपका निजी नोट
यह नोट सिर्फ़ आप देख सकते हैं।

