Haryana Regulatory Comission's Guidelines for Load Forecasts, Resource Plans, and Power Procurement ProcessHaryana1998
Haryana Regulatory Comission's Guidelines for Load Forecasts, Resource Plans, and Power Procurement Process
1998 का अधिनियम संख्या 10
- धाराएँ
- 5
विषय-सूची
- 1The Haryana Electricity Reform Act (Section 15(4)(j) requires, through licence conditions, that power should be purchased in an economical manner and under a transparent power purchase procurement process
- 2The Act clearly envisages a change of approach to procurement as compared with past practice. In addition, the reduction in the role of central evaluation of generation projects previously carried out by the CEA places an additional responsibility on HVPN. It is the Commission's duty to ensure that HVPN develops its power procurement policies and procedures to reflect these new circumstances, drawing as appropriate on international best practice, and it is against this background that these Procurement Practice Guidelines have been developed, as envisaged under Condition 15.2 of the Licence. Their Purpose is to guide HVPN in developing its procurement processes and to establish a routine process of communication of information from Licensees to the Commission in respect of load forecasts, resource plans and procurement which will enable the Commission to monitor on an arms-length basis compliance with the Act and Licence in respect of procurement without the need for it to become involved in the details of specific commercial negotiations or transactions which remain the proper responsibility of licensees, provided that HVPN's procurement policies and procedures are themselves acceptable to the Commission
- 3The draft Guidelines include in Sections 2 and 3 provisions for the production and supply to the Commission of annual 10 year load forecasts by Licensees, and biannual 10 years resources for power procurement, transmission and distribution. These are intended to provide the basis for sound power procurement strategies which will reflect the properly assessed need for new bulk power and the evaluation of options against the requirement to obtain the most economical and reliable supplies
- 4Section 4 of the draft Guidelines deals with procurement itself. Structured Competitive Procurement is set out as the model to be followed by HVPN in all possible cases. It is recognised that in some cases, notably at present the procurement of power from Central Plant, competition may be impractical, and the Guidelines provide for this
- 5The Guidelines are issued following a public consultation process, and in finalising them the Commission have taken into account all comments received. The Commission reserves the right in future to amend the Guidelines in the light of experience, or to issue supplementary Guidelines as appropriate